Friday, January 13, 2012

SAP Production Planning T-codes

PP T-codes


MATERIAL

CREATE-GENERAL MM01 IMMEDIETELY

MM11 SCHEDULE

CHANGE MM02 IMMEDIETELY

MM12 SCHEDULE

MM13 ACTIVATE

FLAG FOR DELETION MM06 IMMEDIETELY

MM16 SCHEDULE

DISPLAY MM03 DISPLAY CURRENT

MM19 DISPLAY AT KEY DATE

DISPLAY CHANGES MM04 ACTIVE CHANGES

MM14 SCHEDULE CHANGES

MM17 MASS MAINTENANCE

MMAM CHANGE MATERIAL TYPE

OTHER MMBE STOCK OVERVIEW

MMPV CLOSE PERIOD

MMRV ALLOW POSTING TO

PREVIOUS PERIOD

MM50 INSTANT MATERIAL VIEW

MMSC ENTER STORAGE LOCATIONS

MM60 MATERIAL LIST

ARCHIVING(MATERIAL) MM71 ARCHIVE/DELETE

MM72 DISPLAY ARCHIVE



BILL OF MATERIAL (MATERIAL BOM)

CS01 CREATE

CS02 CHANGE

CS03 DISPLAY

EXTRAS CS28 ARCHIVING

CS20 MASS CHANGES

EVALUATION/BOM CS11 BOM MULTILEVEL

EXPLOSION/MATERIAL CS12 STRUCTURE MULTILEVEL

BOM CS13 SUMMURISED BOM



WORK CENTRES

CR01 CREATE

CR02 CHANGE

CR03 DISPLAY

CA85 REPLACE

CAPACITY CR11 CREATE

CR12 CHANGE

CR13 DISPLAY

HIERARCHY CR21 CREATE

CR22 CHANGE

CR23 DISPLAY

LINE HIERARCHY LDB1 CREATE

LDB2 CHANGE

LDB3 DISPLAY

REPORTING CR60 W/C INFORMATION SYSTEM

CR05 W/C LIST

CR06 COST CENTRE ASSIGNMENT

CR07 W/C CAPACITIES

CR08 W/C HIERARCHY

WHERE USED CA80 WORK CENTRE

CR15 CAPACITY

CR10 CHANGE DOCUMENTS

EXTRAS CR09 STD. TEXTS TASK LIST

CR41 ARCHIVING



ROUTING

STAD. ROUTING CA01 CREATE

CA02 CHANGE

CA03 DISPLAY

REF. OPERATION SETS CA11 CREATE

CA12 CHANGE

CA13 DISPLAY

RATE ROUTING CA21 CREATE

CA22 CHANGE

CA23 DISPLAY

REF. RATE ROUTING CA31 CREATE

CA32 CHANGE

CA33 DISPLAY

EXTRAS CA85 REPLACE W/C

MASS CHANGES CA95 REPLACE REF. OP. SET

CA75 REPLACE PRT

DELETE TASK LIST CA99 WITH ARCHIVING

CA98 W/O ARCHIVING

REPORTING CA80 WORK CENTRE

WHERE USED LIST CA90 REF. OP. SETS

CA70 PRODUCTION RESORCE TOOLS



COST CENTRE

OKKP MAINTAIN CONTROLLING AREA

KS01 CREATE COST CENTRE

KZS2 CREATE COSTING SHEET

KA01 CREATE PRI. COST ELEMENT

KA06 CREATE SEC. COST ELEMENT

KL01 CREATE ACTIVITY TYPE

KP26 ACTIVITY TYPE/PRICE PLANNING

SALES AND OPERATIONS PLANNING

PRODUCT GROUP MC84 CREATE

MC86 CHANGE

MC85 DISPLAY

GRAPHIC MC91 PRODUCT GROUP

MC92 OVERVIEW

PLANNING MC81 CREATE

FOR PRODUCT GROUP MC82 CHANGE

MC83 DISPLAY



FOR MATERIAL MC87 CREATE

MC88 CHANGE

MC89 DISPLAY

MC74 TRANSFER MATERIALS TO DM

MC9K MATERIAL AVAILABILITY

VERSION MANAGEMENT MC78 COPY

MC80 DELETE

FLEXIBLE PLANNING MC93 CREATE

PLANNING MC94 CHANGE

MC95 DISPLAY

MC9K MATERIAL AVAILABILITY

TOOLS/PLANNING TYPE MC8A CREATE

MACRO MC8B CHANGE

MC8C DISPLAY

EVENT MC64 CREATE

MC65 CHANGE

MC66 DISPLAY

ROUGH CUT PLANNING MC35 CREATE

PROFILE MC36 CHANGE

MC37 DISPLAY

ENVIRONMENT MC90 TRANSFER MATERIALS TO DM

ACTIVITY REQT. KSPP TRANSFER TO COST CENTRE

KSBL COST CENTRE OLANNING REPORT

KSOP TRANSFER TO ACTIVITY BASED COSTING

CPBL PLANNING REPORT PROCESSES

MC9C REPORTING

SETTINGS MC96 FORECAST PROFILE

DISSAGGRIGATION MC76 BREAKDOWN PG PLAN

MC77 DISPLAY PG PLAN

MC75 TRANSFER PG TO PLANNING

MC74 TRANSFER MATERIALS TO DM



FORECASTING

INDIVIDUAL FORECAST MP30 EXECUTE

MP31 CHANGE

MP32 DISPLAY

TOTAL FORECAST MP38 EXECUTE

MP33 REPROCESS

MP39 PRINT

MPBT EXECUTE BACKGROUND

MPDR PRINT BACKGROUND



DEMAND MANAGEMENT

PIR MD61 CREATE

MD62 CHANGE

MD63 DISPLAY

MD65 REQTS. FOR SCINARIO

MD66 COPY SIMULATED DEPENDENT REQT.

MD70 COPY TOTAL FORE CAST

EVALUATION MD73 DISPLAY TOTAL REQT.

MD79 EXCELL INTERFACE

MD4C ORDER REPORT

MD72 CHARECTERISTICS PLANNING

CUSTOMER REQT. MD81 CREATE

MD82 CHANGE

MD83 DISPLAY



REPETITIVE MANUFACTURING

MASTER DATA C223 PRODUCTION VERTION

PRODUCT COST PLANNING

COSTING RUN CKMATSEL CREATE

SELECTION LIST CKMATCON Edit

CK40N EDIT COSTING RUN

Master Data MD25 Create planning calendar

MD26 Change planning calendar

MD27 Display planning calendar

MDSA Display BOM explosion number

MDSP Edit BOM explosion number

MEQ1 Maintain quota file

OPPP Explode BOM by date

MDUS Display project assignment

MDUP Process project assignment

MDL1 Create production lot

MDL2 Change production lot

MDL3 Display production lot



Planning MD20 Create planning file entry

MD21 Display planning file entry

MDAB Set up planning file entry in background

MDRE Check planning file entry

MD01 Total planning online

MDBT Total planning in background

MD03 Single-item, single-level planning

MD02 Single-item, multi-level planning

MD43 Interactive single-item planning

MD50 Multi-level, make-to-order planning

MD51 Multi-level project planning

MF52 Display planning table

MF50 Change planning table

MF57 Planning table by MRP lists

MF51 Planning table by production list



Evaluations MD04 Stock/requirements list

MD07 Collective access of stock/requirements lis

MD05 MRP list

MD06 Collective access of MRP lists

MDLD Print MRP list

MD45 Planning result

MD46 Collective access of planning result

MD44 Planning situation for a material

MD47 Planning situation for a product group

MD48 Cross-plant planning situation

MD4C Order report

MD09 Pegged requirements

CO46 Order progress



Planned Order MD11 Create planned order

MD12 Change planned order

MD13 Individual access of planned order

MD16 Collective access of planned orders

MD14 Individual conversion of planned order into

MD15 Collective conversion of planned orders int

MDUM Convert planned order into purchase requisi

CO40 Convert individual planned order into produ

CO41 Collective conversion of planned orders int

CO48 Partial conversion of planned order into pr

COR7 Individual conversion of planned order into

COR7_PC Collective conversion of planned orders int

COR8 Partial conversion of planned order into pr

MDVP Collective availability check

MDAC Execute action for planned order



LONG TERM PLANNING

PALNNING SCENARIO MS31 CREATE

MS32 CHANGE

MS33 DISPLAY

PLANNING RUN MS01 ON LINE

MSBT SA BACKGROUND JOB

MS02 SINGLE ITEM - MULTI LEVEL

MS03 SINGLE ITEM - SINGLE LEVEL

MS50 SINGLE ITEM - SALES ORDER

MS51 SINGLE ITEM PLANNING, PROJECT

MFSO PLANNING TABLE



EVALUTIONS MS05 MRP LIST MATERIAL

MS06 MRP LIST COLLECTIVE DISPLAY

MSLD PRINT MRP LIST

MS04 STOCK/REQUIREMENTS LIST

MS07 STOCK/REQUIREMENT LIST COLLECTIVE DISPLAY

MS44 PLANNING SITUATION MATERIAL

MS47 SITUATION PRODUCT GROUP



MPS-MASTER SCHEDULE ITEMS

TOTAL PLANNING MD40 ON LINE

MDBS SA BACKGROUND JOB

MD41 SINGLE ITEM - MULTI LEVEL

MD42 SINGLE ITEM - SINGLE LEVEL

MD43 SINGLE ITEM - INTERACTIVE

MD50 SINGLE ITEM - SALES ORDER

MD51 SINGLE ITEM PLANNING, PROJECT



*** EVALUTION IS SIMILAR TO MRP

PRODUCTION CONTROL

ORDER - CREATE CO01 WITH MATERIAL

CO07 WITHOUT MATERIAL

CO40 FROM PLANNED ORDER

CO41 COLLECTIVE CONVERTION OF PLANNED ORDER

CO08 FOR SALES ORDER

CO10 FOR PROJECT

CO02 CHANGE

CO03 DISPLAY



CONTROL MD04 STOCK/REQUIREMENTS LIST

COHV MASS PROCESSING

COMAC COLLECTIVE AVAILABILITY CHECK

CO05N COLLECTIVE RELEASE

CO04N PRINT

CO09 AVAILABILITY OVER VIEW



GOODS MOVEMENT MF65 STOCK TRANSFER FOR RESERVATION
MF60 - Material Staging for Planned Orders


MATERIAL STAGING MF68 LOG

MB1A GOODS ISSUE

MB31 GOODS RECEIPT

COWBPACK PACK MATERIAL



CONFIRMATION CO1V TIME TICKET

FOR OPERATION CO14 DISPLAY

CO13 CANCEL

CO1L REQUESTED CONFIRMATIONS

CO1P PREDEFINED PROCESSES



TOOLS-ARCHIVING CO78 ORDER

KOAA SETTELMENT DOCUMENTS



CAPACITY PLANNING

EVALUTION CM01 LOAD



WORK CENTER VIEW CM02 ORDERS

CM03 POOL

CM04 BACKLOG

CM05 OVERLOAD

CM07 VARIABLE

EXTENDED EVALUTION CM50 WORK CENTER VIEW

CM51 INDIVIDUAL CAPACITY VIEW

CM52 ORDER VIEW

LEVELLING CM21 PLANNING TABLE (GRAPHICAL)

WORK CENTER VIEW CM22 PLANNING TABLE (TABULAR)

INDIVIDUAL CAPACITY VCM27 PLANNING TABLE (GRAPHICAL)

CM28 PLANNING TABLE (TABULAR)

ORDER VIEW CM31 PLANNING TABLE (GRAPHICAL)

CM32 PLANNING TABLE (TABULAR)

AVAILABLE CAPACITY CR12 CHANGE

CAPACITY CR13 DISPLAY

OP4A SHIFT SEQUENCE

OP43 FACTORY CALENDER

No comments:

Post a Comment