CJ01 Create Work Breakdown Structure

CJ02 Change Work Breakdown Structure

CJ03 Display Work Breakdown Structure

CJ06 Create Project Definition

CJ07 Change Project Definition

CJ08 Display Project Definition

CJ11 Create WBS Element

CJ12 Change WBS Element

CJ13 Display WBS Element

CJ14 Display WBS Element (From DMS)

CJ20 Structure planning

CJ20N Project Builder

CJ21 Change Basic Dates

CJ22 Display Basic Dates

CJ23 Change Forecast Dates

CJ24 Display Forecast Dates

CJ25 Change Actual Dates

CJ26 Display Actual Dates

CJ27 Project planning board

CJ29 Update WBS (Forecast)

CJ2A Display structure planning

CJ2B Change project planning board

CJ2C Display project planning board

CJ2D Structure planning

CJ30 Change Project Original Budget

CJ31 Display Project Original Budget

CJ32 Change Project Release

CJ33 Display Project Release

CJ34 Project Budget Transfer

CJ35 Budget Return from Project

CJ36 Budget Supplement to Project

CJ37 Budget Supplement in Project

CJ38 Budget Return in Project

CJ3A Change Budget Document

CJ3B Display Budget Document

CJ40 Change Project Plan

CJ41 Display Project Plan

CJ42 Change Project Revenues

CJ43 Display Project Revenues

CJ44 Act. overhd: Projects, ind. process.

CJ45 Act. ovhd: Projects, coll. process.

CJ46 Plnd ovrhd: Projects, ind. process.

CJ47 Pld Overhead: Projects, Coll.Procssg

CJ48 Change Payment Planning: Init.Screen

CJ49 Display Payment Planning: Init.Scrn

CJ70 Maintain Project Settlement LIs

CJ72 Project: Act. amt. line item settlmt

CJ74 Project Actual Cost Line Items

CJ76 Project Commitment Line Items

CJ7E Plan Data Transfer: Projects

CJ7G Plan Data Transfer: Projects

CJ7M Project Plan Cost Line Items

CJ7N Maint. DRG inv.projects for retmt.

CJ80 Availability Control - Overview

CJ81 Update Report List

CJ88 Settle Projects and Networks

CJ8A Act.-setlmt: Proj. retirmt. from IM

CJ8G Actual Settlement: Projects/Networks

CJ8V Period Close for Project Selection

CJ91 Create Standard WBS

CJ92 Change Standard WBS

CJ93 Display Standard WBS

CJ9B Copy WBS Plan to Plan (Collective)

CJ9B_OLD Copy Project Cost Planning (old)

CJ9BS Copy WBS Plan to Plan (Indiv.)

CJ9C Copy WBS Actual to Plan (Collective)

CJ9C_OLD Copy Project Revenue Planning (old)

CJ9CS Copy WBS Actual to Plan (Indiv.)

CJ9D Copy Plan Versions

CJ9E Plan Settlement: Projects

CJ9ECP Project System: Easy Cost Planning

CJ9F Copy Project Costing (Collective)

CJ9FS Copy Project Costing (Indiv.)

CJ9G Plan Settlement: Projects

CJ9K Network Costing

CJ9L Forecast Costs: Individual Projects

CJ9M Forecast Costs: Coll.Project Proc.

CJ9Q Integrated Planning for Ntwks(Coll.)

CJ9QS Integrated Planning for Ntwks (Ind.)

CJA1 Proj.Rel.Order Receipts: Coll.Proc.

CJA2 Proj.Rel. Order Receipts: Ind.Proc.

CJAL Send project

CJB1 Generate Settmt Rule: Coll.Proc.

CJB2 Generate Settmt Rule: Indiv.Proc.

CJBBS1 Planning Board Report Assignment

CJBBS2 Structure Overview Report Asst

CJBN Reconstruct Availability Control

CJBV Activate Project Availabilty Control

CJBW Deactivate Project Availabilty Cntrl

CJC1 Maintenance Dialog for Stat.by Per.

CJC2 Maintain Planned Status Changes

CJCD Change documents: WBS

CJCF Carry Forward Project Commitments

CJCO Carry Forward Project Budget

CJCS Standard WBS

CJE0 Run Hierarchy Report

CJE1 Create Hierarchy Report

CJE2 Change Hierarchy Report

CJE3 Display Hierarchy Report

CJE4 Create Project Report Layout

CJE5 Change Project Report Layout

CJE6 Display Project Report Layout

CJEA Call Hierarchy Report

CJEB Background Processing, Hier.Reports

CJEC Maintain Project Crcy Trans.Type

CJEK Copy Interfaces/Reports

CJEM Project Reports: Test Monitor

CJEN Reconstruct: Summarized Proj.Data

CJEO Transport Reports

CJEP Transport Forms

CJEQ Import Reports from Client

CJET Translation Tool - Drilldown

CJEV Maintain Global Variable

CJEX Reorganize Drilldown Reports

CJEY Reorganize Report Data

CJEZ Reorganize Forms

CJF1 Create Transfer Price Agreement

CJF2 Change Transfer Price Agreement

CJF3 Display Transfer Price Agreement

CJF4 Transfer Price Agreement List

CJFA Analysis of Data Trans. into PS Cash

CJFN CBM Payment Converter

CJG1 Enter Transfer Price Allocation

CJG3 Display Transfer Price Allocation

CJG4 Enter Trsfr Price Allocation: List

CJG5 Cancel Transfer Price Allocation

CJH1 Reconstruct Project Inheritance

CJH2 Project Inheritance Log

CJI1 Project Budget Line Items

CJI2 Budget Line Items: Document Chain

CJI3 Project Actual Cost Line Items

CJI4 Project Plan Cost Line Items

CJI5 Project Commitment Line Items

CJI8 Project Budget Line Items

CJI9 Project Struct.Pld Costs Line Items

CJIA Project Actual and Commt Paymt LIs

CJIB Project Plan Payment Line Items

CJIC Maintain Project Settlement LIs

CJID Display Project Settlement Line Itms

CJIE Projects: Retirement LI Settlement

CJIF Projects: Profitability Analysis LI

CJIG Display PS Cash Documents

CJJ2 Change Statistical Key Figures

CJJ3 Display Statistical Key Figures

CJK2 Change Statistical Key Figures

CJK3 Display Statistical Key Figures

CJL2 Collective Agreement

CJN1 Reval. ACT: Projects Ind.Pro.

CJN2 Reval. ACT: Projects Col.Pro.

CJNO Number range maintenance: FMCJ_BELNR

CJO8 Overhead COMM: Projects Ind.Pro.

CJO9 Overhead COMM: Projects Col.Pro.

CJP1 Create Project Plan Adjustment

CJP2 Change Project Plan Adjustment

CJP3 Display Project Plan Adjustment

CJP4 Delete Project Plan Adjustment

CJPN Number Range Maintenance: Proj.Items

CJPU Execute Project Plan Adjustment

CJR2 PS: Change plan CElem/Activ. input

CJR3 PS: Display plan CElem/Activ. input

CJR4 PS: Change plan primary cost element

CJR5 PS: Display plan primary cost elem.

CJR6 PS: Change activity input planning

CJR7 PS: Display activity input planning

CJR8 PS: Change revenue type planning

CJR9 PS: Display Revenue Element Planning

CJS2 PS: Change stat. key figure planning

CJS3 PS: Display stat. key fig. planning

CJS4 PS: Change stat. key figure planning

CJS5 PS: Display stat. key fig. planning

CJSA Data Transfer to SAP-EIS

CJSB Select Key Figure and Characteristic

CJSG Generate WBS Element Group

CJSN Number Range Maintenance: Projects

CJT2 Project Actual Payment Line Items

CJV1 Create project version (simulation)

CJV2 Change project version (simulation)

CJV3 Display project version (simulation)

CJV4 Transfer project

CJV5 Delete simulation version

CJV6 Maintenance: Version administration

CJV7 Display transfer log

CJVC Value Category Checking Program

CJW1 EURO: Adjust Project Budget

CJZ1 Act. Int Calc.: Projects Coll. Proc.

CJZ2 Actual Int.Calc.: Project Indiv.Prc.

CJZ3 Plan Int.Calc.: Project Indiv.Prc.

CJZ5 Plan Int.Calc.: Project Coll.Prc.

CJZ6 Actual Int.Calc.: Indiv.CO Order Prc

CJZ7 Planned Int.Calc: Indiv.CO Ord.Proc.

CJZ8 Actual Int.Calc.: Coll.CO Order Prc.

CJZ9 Plan Int.Calc.: Coll.CO Order Prc.

CN01 Create Standard Network

CN02 Change Standard Network

CN03 Display Standard Network

CN04 Edit PS Text Catalog

CN05 Display PS Text Catalog

CN06 MPX Download: Standard Network

CN07 MPX Upload: Standard Network

CN08 Allocate material -> stand. network

CN09 Allocate material -> stand. network

CN11 Create standard milestone

CN12 Change standard milestone

CN13 Display standard milestone

CN19 Display Activity (From DMS)

CN20 Dsply network/act.bsc data init.scrn

CN21 Create Network

CN22 Change Network

CN23 Display Network

CN24 Overall Network Scheduling

CN24N Overall Network Scheduling

CN25 Confirm Completions in Network

CN26 Display Mat.Comp/Init: Ntwk,Acty,Itm

CN26N Display Mat. Components (From DMS)

CN27 Collective confirm.

CN28 Display Network Confirmations

CN29 Cancel Network Confirmation

CN2X Confirm Completions in Network

CN30 Processing PDC error records

CN33 PDM-PS interface

CN34 Maintain release table TCNRL

CN35 Control stock / account assignment

CN36 BOM Transfer Profile

CN37 BOM Allocation Field Selection

CN38 Maintain Flexible Reference Point

CN40 Project Overview

CN41 Structure Overview

CN42 Overview: Project Definitions

CN42N Overview: Project Definitions

CN43 Overview: WBS Elements

CN43N Overview: WBS Elements

CN44 Overview: Planned Orders

CN44N Overview: Planned Orders

CN45 Overview: Orders

CN45N Overview: Orders

CN46 Overview: Networks

CN46N Overview: Networks

CN47 Overview: Activities/Elements

CN47N Overview: Activities/Elements

CN48 Overview: Confirmations

CN48N Overview: Confirmations

CN49 Overview: Relationships

CN49N Overview: Relationships

CN50 Overview: Capacity Requirements

CN50N Overview: Capacity Requirements

CN51 Overview: PRTs

CN51N Overview: PRTs

CN52 Overview: Components

CN52N Overview: Components

CN53 Overview: Milestones

CN53N Overview: Milestones

CN54N Overview: Sales Document

CN55N Overview: Sales and Dist. Doc. Items

CN60 Change Documents for Projects/Netw.

CN61 Standard network

CN65 Change documents order /network

CN70 Overview: Batch variants

CN71 Create versions

CN72 Create Project Version

CN80 Archiving project structures

CN81 PS: Archiving project - preliminary

CN82 PS: Archiving project structures

CN83 PS: Archiving project - Info System

CN84 PS: Archiving project - admin.

CN85 PS: Delete operative structures

CN98 Delete Standard Networks

CN99 Archiving Standard Networks

CNB1 Purchase requisitions for project

CNB2 Purchase orders for project

CNC4 Consistency checks for WBS

CNC5 Consistency checks sales order/proj.

CNE1 Project Progress (Individual Proc.)

CNE2 Project Progress (Collective Proc.)

CNE5 Progress Analysis

CNG1 Netw./Hier.: Maintain frame types

CNG2 Netw./Hier.: Maintain form def.

CNG3 Netw./hier.: maintain color definit.

CNG4 Netw./Hier.: Maintain graph. profile

CNG5 Netw./Hier: Maintain options profile

CNG6 Netw./hier.: Maintain node type

CNG7 Netw./Hier.: Maintain link types

CNG8 Netw./Hier.: Maintain field def.

CNG9 Graph. Cust. Netw./Hierarchy Graph.

CNL1 Create delivery information

CNL2 Change delivery information

CNL3 Display delivery information

CNMASS Mass Changes in Project System

CNMASSPROT Display log f. mass changes PS

CNMM Project-Oriented Procurement

CNMT Milestone Trend Analysis

CNN0 Number Range for Library Network

CNN1 Number range maint.: ROUTING_0

CNPAR Partner Overview

CNPRG Network Progress

CNR1 Create Work Center

CNR2 Change Work Center

CNR3 Display Work Center

CNS0 Create deleivry from project

CNS40 Project Overview

CNS41 Structure Overview

CNS42 Overview: Project Definitions

CNS43 Overview: WBS Elements

CNS44 Overview: Planned Orders

CNS45 Overview: Orders

CNS46 Overview: Networks

CNS47 Overview: Activities/Elements

CNS48 Overview: Confirmations

CNS49 Overview: Relationships

CNS50 Overview: Capacity Requirements

CNS51 Overview: PRTs

CNS52 Overview: Components

CNS53 Overview: Milestones

CNS54 Overview: Sales Document

CNS55 Overview: Sales and Dist. Doc. Items

CNS60 Change Documents for Projects/Netw.

CNS71 Create versions

CNS83 PS: Archiving project - Info System

CNSE5 Progress Analysis

CNVL Variable Overviews

CNW1 WWW: Confirmation

CNW4 Project Documents

OP00 Maintain Operation Control Key

OP01 Customizing Routing/Work Center

OP03 Factory Calendar C

OP04 Word Processing

OP07 Standard Text

OP08 Standard Text

OP09 Maintain Alternative Activity Desc.

OP10 Maintain Person Responsible

OP11 Maintain Period Pattern Key

OP12 Maintain Location

OP13 Maintain Screen Sequence

OP14 Maintain Type of Std. Value Determin

OP15 Production User Profile

OP16 Maintain Period Pattern

OP17 Formula Parameters

OP18 Maintain Setup Group/Setup Group Cat

OP19 Standard Value Key

OP20 Maintain Setup Type Key

OP21 Define Formula

OP22 Maintain Wage Groups

OP23 Maintain Location

OP24 Maintain period dependent oper. val.

OP26 Maintain suitability

OP28 Maintain Perf. Efficiency Rate Key

OP30 Maintain Move Time Matrix

OP31 Maintain Time Segment (Per. Pattern)

OP32 Maintain Capacity Category

OP34 Maintain Work Center Planner Group

OP35 Maintain Perf. Efficiency Rate Key

OP36 Maintain Capacity Default Values

OP37 Maintain Available Capacity Version

OP38 Maintain Setup Type Key

OP39 Maintain Graphics Profile

OP40 Maintain Work Center Category

OP41 Matchcode for work center

OP42 Default work center

OP43 Maintain Setup Group Categories

OP44 Maintain Task List Usage

OP45 Maintain Usage

OP46 Maintain Task List Status

OP47 Maintain PRT Usage

OP48 Maintain Planner Group

OP49 Matchcode for Routings/Ref. Op. Sets

OP4A Maintain Shift Sequences

OP4B Overview variant: Routing

OP4C Overview variant: Ref. oper. set

OP4D Overview variant: Rate routing

OP4E Overview variant: Ref. rate routing

OP4F Overview var.:Scheduling of routings

OP4G Overview var.:Scheduling ref.op.set

OP4H Overview var.:Scheduling of rate rtg

OP4I Overview var.:Scheduling RefRateRtgs

OP50 Assign Material Types

OP51 Formula Parameters

OP52 Formula Parameters

OP53 Formula Parameters

OP54 Define Formula

OP55 Define Formula

OP56 Define Formula

OP57 Define Formula

OP58 Maintain Default Value Profiles

OP59 Formula Parameters

OP5A Field Selection: Task List Overview

OP5B Field Selection: Task List Header

OP5C Field Selection: Task List Sequence

OP5D Field Selection: Task List Details

OP5E Field selection task list overview

OP5F Field selection std network -> PRT

OP5H Field sel. insp.plan characteristics

OP61 Number range maintenance: ROUTING_3

OP62 Number ranges for routings

OP63 Number Ranges for Ref.Operation Sets

OP64 Maintain Setup Group Key

OP65 Formula Parameters

OP66 Maintain Location Group

OP67 Maintain Operation Control Key

OP68 Maintain Move Time Matrix

OP69 Maintain wage type

OP70 Maintain PRT Control Key

OP71 Maintain Wage Group

OP72 PRT Control Key

OP73 PRT Authorization Group

OP74 Maintain PRT Group Key

OP76 Define suitability

OP77 Engineering Workbench for Task Lists

OP78 Maintain Type of Std. Value Determin

OP7A Customizing matchcode for PRTs

OP7B Define Parameters

OP80 Maintain PRT Status

OP82 Define Formula

OP84 Profiles: Default Values for Rtgs.

OP85 Profiles: Default Values for QM

OP87 Maintain Routing/Ref.Op.Set Usage

OP88 Maintain Assignmt. of Task List Type

OP8A Maintain operation value description

OP8B Maintain standard value texts

OP8C Record layout for background (APL)

OP8D Data transfer APL

OP8E Command file task lists Rel. 2.2A

OP8F Maintain production scheduler

OP8H Profiles: Default Values for Rtgs.

OP91 Maintain Object Overview Version

OP95 Assign Work Center Cat. to Applicatn

OP96 Maintain Work Center Category

OP97 Maintain Performance Efficiency Rate

OP98 Maintain Validity of Perf.Effic.Rate

OPA0 Status selection profiles

OPA1 Maintain combination definitions

OPA2 Define selection profile

OPA3 Define option profile

OPA4 Define list profile

OPA5 Define graphics profile

OPA6 Define overall profile

OPA7 Define columns

OPA9 Maintain selection profiles

OPB1 Define list versions

OPB2 Define distribution function

OPB3 Specify distribution functions

OPB4 Specify distribution strategies

OPB5 Specify distribution key

OPC0 Axis representation selection

OPC1 Maintain axis representation

OPC2 Curve representation selection

OPC3 Maintain curve representation

OPC5 Max. no. of data records

OPCD Capacity category

OPCE Capacity planner

OPCF Time units

OPCG Maintain Operation Control Key

OPCH Maintain production scheduler

OPCI Setup group key/category

OPCL Scheduling type

OPCM Standard value key

OPCN Maintain move time matrix

OPCQ Efficiency rate

OPCR Formula parameters

OPCS Define formula

OPCT Strategies

OPCU Strategy levels

OPCW Planned order parameters

OPCX Formula parameters

OPCY Define formula

OPD0 Resource planning overall profile

OPD1 Resource planning selection profile

OPD2 Capacity leveling - time profile

OPD3 Resource planning evaluation profile

OPD4 Resource planning period profile

OPD5 Flow control definition

OPD6 Flow control control table

OPD7 Flow control statuses

OPD8 Flow Control Actions

OPD9 Flow Control Messages

OPDA Transition matrix (setup matrix)

OPDB Capacity Leveling Strategy Profile

OPDD Factory calendar

OPDE Resource planning control profile

OPDF Define requirements grouping

OPDH Capacity leveling - list profile

OPDJ Define layout

OPDK Define standard overview

OPDL Cap. plan. detailed cap.list maint.

OPDM Define detail list (leveling)

OPDQ Profile for planning table (tab.)

OPDR Define layout key

OPDT Define detail list

OPDU Maintain perf. efficiency rate key

OPDV Com-file (Rel-Info/OLPK) KOP. Set´s

OPDW Com-file (Rel-Info/OLPK) KOP. Set´s

OPE0 Maintain Sort String

OPE1 Maintain Value Type

OPE2 Maintain Machine Type

OPE3 Maintain Planner Group

OPE4 Maintain Control Parameters

OPE5 Maintain rounding categories

OPE6 Maintain Rounding Category

OPE7 Maintain overhead key

OPE8 Maint. Roundg. and Add.Val.Key (Def)

OPE9 Maintain User Profile

OPEA User selection

OPEB Automatic selection

OPEC PP user fields

OPENPS Download Activities to Palm Pilot

OPF0 Maintain User

OPF1 Authorizations for CAPP

OPFA Field selection: Work center

OPFP Configuring the Fixed Price Version

OPFR01 RPUCORF0PBS : IMG Link

OPG0 Profile for planning table

OPG1 Chart sequence - selection

OPG2 Line representation

OPG3 Scale time axis

OPG4 Time scale profile

OPG5 Graphic obj.type sel./repr.profile

OPG6 Transition matrix setup fam.key

OPG7 Line display selection

OPG9 Graphical object type/obj.represent.

OPGD Ref. Oper. Set-All Task Lists (PP)

OPGE Ref. Oper. Set - Rate Routings (PP)

OPGF Work Center - All Task Lists (PP)

OPGG Work Center - Rate Routings (PP)

OPGH Document PRT - All Task Lists

OPGI Equipment PRT - All Task Lists

OPGJ Material PRT - All Task Lists

OPGK Misc. PRT - All Task Lists

OPGL Resource - Master Recipes (PI)

OPGM Process Instr. Cat. - Master Recipe

OPGN Document PRT - Maintenance Task List

OPGO Equipment PRT-Maintenance Task Lists

OPGP Material PRT - Maintenance Task List

OPGQ Misc. PRT - Maintenance Task Lists

OPGR Work Center - Standard Network (PS)

OPGS Document PRT - Standard Network (PS)

OPGT Equipment PRT - Standard Network(PS)

OPGU Material PRT - Standard Network (PS)

OPGV Misc. PRT - Standard Network (PS)

OPH1 CO Cash Bgt Mgmt: Delete Actual Data

OPH2 PS Cash Management: Delete Plan Data

OPH3 CO Cash Bgt Mgmt: Delete Master Data

OPH4 CO Cash Bgt Mgmt: MM Data Transfer

OPH5 CO CBM: Successive FI Data Transfer

OPH6 CO CBM: Take Over FI Completely

OPH7 CO-CBM: Take Over All Data

OPI1 Maintain Value Categories

OPI2 Value Categories for Cost Elements

OPI3 Update Control: File RPSCO

OPI4 Commitment Item Value Categories

OPI5 Value Categories for Stag.Key Figs

OPI6 Activate CO Cash Budget Management

OPI8 Display Value Category

OPIA Interest Profile for Projects

OPIB Maintain Interest Profile

OPIC Intrst Relevance: Cost Els/Cmmt Itms

OPID Proj.Int Calc: Account Determination

OPIE Interest Indicator

OPIF View Maintenance:Compound Int.Cont.

OPIG View Maint.: Compound Int. Periods

OPIH Interest Scale, General Conditions

OPIN Number range maintnce: VHU_PINST

OPJ2 Production order stock determination

OPJ4 Schedule batch function request

OPJ6 Maintain Status Profiles

OPJ7 Maintain Routing Usage

OPJ8 Maintain Operation Control Key

OPJ9 Maintain prod. scheduler group

OPJA Maintain setup group/group category

OPJB Specify system messages

OPJC Maintain Wage Groups

OPJD Item Categories

OPJE User Selection

OPJF Automatic Selection

OPJG Maintain Default Values

OPJH Order types production order

OPJI BOM Usage Priorities

OPJJ Maintain Scope of Check

OPJK Maintain Control

OPJL Maintain Checking Rule

OPJM Application-Specific Criteria

OPJN Maintain Scheduling Type

OPJO C MM-BD units of measurement

OPJP Maint. acct.assgnm.types for orders

OPJQ Standard Value Key

OPJR Maintain move time matrix

OPJS PP: Maintain reduction strategies

OPJT Maintain Strategy Levels

OPJU Production order control parameters

OPJV Maintain Capacity Category

OPJW Maintain Capa.Planr.Grp for WrkCentr

OPJX Factory Calendar C

OPJY Maintain perf. efficiency rate key

OPJZ Maintain Release Periods

OPK0 Confirmation Parameters PP

OPK0T Confirmation Parameters

OPK1 Confirmation Parameters PP-PI

OPK1T Confirmation Parameters

OPK2 Formula Parameters

OPK3 Define Formula

OPK4 Confirmation Parameters

OPK5 Maintain variances

OPK6 List Layout

OPK7 Accessing Customizing PDC transfer

OPK8 Maintain print control prod. orders

OPK9 Maintain Goods Receipt Valuation

OPKA Maintain Movement Types

OPKB Control parallel confirmation

OPKC Control confirmation process chain

OPKD Control confirmation process chain

OPKE Screen Sequence for Components

OPKF Control parallel confirmation

OPKG Maintain Messages

OPKH Maintain Breakpoints

OPKI Maintain Collective Confirmation

OPKJ Maintain PRT Control Key

OPKK Standard Text

OPKL Formula Parameters

OPKM Define Formula

OPKN Overview variant production control

OPKO Command File for Production Orders

OPKP Shop floor control profile

OPKQ Customizing: Matchcode for Proc.Ord.

OPKR Print flag

OPKS Maintain Origins for CO Object

OPKT Initial Screen: Settlement Structure

OPKU Maintain Collective Confirmation

OPKV Print Flag

OPKW Print shop papers

OPKX Deletion Flag/Indicator

OPKZ Customizing Matchcode for ProdOrder

OPL1 Costing Variants: PP Prod. Order

OPL2 Maintain trigger point group

OPL3 Trigger point usage

OPL4 Profile for missing parts list

OPL5 Order type LIS parameters

OPL6 Profile for documented goods mvmts

OPL7 Order change management profile

OPL8 Order type parameters: Overview

OPL9 Parameters for order change mgmt

OPLA Conditions: V_T682F for H CO

OPLB CondTab: Create (batch, prod.)

OPLC CondTab: Change (batchs, prod.)

OPLD CondTab: Display (batches, prod.)

OPLE Strategy types: Batch determ. (prod)

OPLF Access: Maintain batch determ.(prod)

OPLG Batch determ.: Procedure for prod.

OPLH Overview variant - production orders

OPLI Background job for goods movements

OPLJ Job "Fast entry confirmation"

OPLK Overall profile for order prog. rep.

OPLL Order progress: Displayed fields

OPLM Order progress: Displayed fields

OPLO maintain selection profile

OPLP Job "Convert planned order"

OPLQ maintain filter for control keys

OPLR Maintain filter for capacity version

OPLS Parallel processing control

OPLT Target System for Data Transfer

OPLV Maintain Filter for Task List Usage

OPLW Maintain Filter for Task List Status

OPLX Maintain Filter for BOM Usage

OPLY Maintain Filter for BOM Status

OPLZ Maintain POI Planned Order Selection

OPM0 Maintain profile - field selection

OPM1 Costing Variants - Production Order

OPM2 Maintain Detail Screen Control Oper.

OPM3 Maintain Detail Scrn Control Header

OPMF Field Selection - BOM Transfer

OPMI Import models activities

OPMJ Determine progress values

OPN0 Master Recipe Profile

OPN1 Maintain Profiles for Master Recipes

OPN2 Valuation Variants - Prod. Order

OPN3 Overv.Var.: Master Recipe Scheduling

OPN5 Field Seln: Std Network Overview

OPN6 Field Selection Standard Network Hdr

OPN7 Field Sel.:Std Ntwk Activity Detail

OPN8 Field Sel.:Std.Ntwk Comp.Overview

OPN9 Field Sel. Std Ntwk Comp.Detail

OPO1 Create Cost Element Planning Layout

OPO2 Change Cost Element Planning Layout

OPO3 Display Cost Element Planning Layout

OPO4 Create Stat. KF Planning Layout

OPO5 Change Stat. KF Planning Layout

OPO6 Display Stat. KF Planning Layout

OPO7 View Maintenance V_TCJ41_7

OPO8 View Maintenance V_TCJ41_8

OPO9 View Maintenance V_TCJ41_9

OPOA View Maintenance V_T003O_N0

OPOB View Maintenance V_T003O_N1

OPOC View Maintenance V_T399X_N0

OPOD View Maintenance V_T399X_N1

OPOE View Maintenance T_T399X_N2

OPP1 Customizing MRP

OPP2 MPS

OPP3 Customizing Repetitive Manufacturing

OPP5 List Profile Component List

OPPA PP/MRP Customizing Explosion

OPPB Direct Procurement

OPPC Period Grouping

OPPD Customizing Planning Time Fence

OPPE Conversion Plnnd Order -> Prod.Order

OPPE01 General iPPE Customizing

OPPE02 Define iPPE Node Type

OPPE03 Define iPPE Variant Types

OPPE04 Define iPPE Alternative Types

OPPE05 Define iPPE Relationship Types

OPPE06 Customer-Spec. Model Assgts (iPPE)

OPPE07 Time Analysis: Partner Products iPPE

OPPE11 Profiles: iPPE WB Professional

OPPE12 Tabs: iPPE Workbench Professional

OPPE13 User Assgmt: iPPE WB Professional

OPPE14 Define Reports for iPPE WB Prof.

OPPE15 Define Interface for iPPE Workbench

OPPE20 Profile Maintenance iPPE PS

OPPEACT01 Define Std Val. Determin. Type

OPPEACT02 Object Dependency in Process Struct.

OPPECHK01 Customizing: Consistency Check

OPPEDOK Documentation

OPPELUI01 Profile Definition: iPPE WB Express

OPPELUI02 User Assignment: iPPE WB Express

OPPERES01 Customizing for Production Resources

OPPESCMPV Object Dependent Status Management

OPPESTATUS Cross-Application Status Management

OPPF Customizing for Order Report

OPPH Customizing Purchase Req. Conversion

OPPI Available Stock

OPPJ MRP Checking Rule

OPPK Hierarchy Element

OPPL MRP

OPPM Evaluation Profiles

OPPN Layout

OPPO Hierarchy Element

OPPP Customizing Direct Procurement

OPPQ C M MRP Plant Parameters for MRP

OPPR C M MRP MRP Group

OPPS Strategy

OPPT Strategy Group

OPPU Strategy Group for MRP Group

OPPZ MRP Group

OPR1 Area of Responsibility <-> Message

OPR3 Definition of Breakpoints

OPR4_ACT Multilevel Actual Settlement

OPR4_CK Material Cost Estimate

OPR4_CKMC Mass Costing - Sales Documents

OPR4_CKML Closing and Calc. of Periodic Price

OPR4_CKPF Price Update

OPR4_FCO Collective Processing: Variances

OPR4_KKA WIP Calculation

OPR4_KKP Repetitive Mfg and Process Mfg

OPR4_KKS Collective Processing: Variances

OPR4_KKS1 Individual Processing: Variances

OPR4_PPCO Production Order: Cost Calculation

OPR5 Definition of Error Mgmt IDs (SAP)

OPR6 Definition of Object IDs (SAP)

OPR7 Def. of Areas of Responsibility

OPR8 Def. of Minimum Message Types (SAP)

OPR9 Def. of Reference Objects (SAP)

OPRCMFE User-Defined Messages

OPRF Maintain Quotation Prefixes

OPS Customizing for Project System

OPS0 Maintain print control for networks

OPS1 Maintain User Fields

OPS2 Maintain Relationship Texts

OPS3 Maintain PS Text Types

OPS4 maintain simulation profile

OPS5 Maintain Standard Network Profile

OPS6 Maintain Project Manager

OPS7 Maintain Applicant

OPS8 Materialflow network

OPS9 Budget Management Profile

OPSA Maintain Project Profile

OPSB Cost Planning Profile

OPSC Create network types

OPSCAS Command File Payments (PS)

OPSCOS Command File Costs (PS)

OPSD Maintain Profile for Report Lines

OPSE Maintain Report Groups

OPSF Maintain Report Variations

OPSG Order change management profile

OPSH Maintain ctrl. key for activity (PS)

OPSI Edit PS validation rules

OPSINS Command File Info System (PS-F)

OPSJ Maintain Project Coding

OPSK Maintain Special Characters

OPSL Project Info System Overview Maint.

OPSM Maintain Overall Profile PS InfoSys

OPSN Edit PS substitution rules

OPSO Maintain Project Types

OPSP Capacity availability check

OPSPAR1 Maintain Partner Functions

OPSPAR2 Define Lang.-Dep.Partner Functions

OPSPAR3 WBS Partner Profile

OPSQ Intervals for Cost/Revenue Types

OPSR Maintain milestones

OPSREV Command File Revenues (PS)

OPSS Maintain milestones

OPST Network Confirmation Parameters

OPSU Maintain Activity Control Key

OPSV Cost object ind.

OPSW Info System Profile

OPSX PS: Reset "Budgeted" Status

OPT1 Maintain PS Transaction Types

OPT2 Matchcode for project definition

OPT3 Matchcode for WBS elements

OPT4 Matchcode for standard network

OPT5 Customizing matchcode for network

OPT6 Maintain std. milestone group

OPT7 Project planning board profile

OPT8 Maintain hierarchy graphic / dates

OPT9 Network parameters for PS-SD

OPTA Command file for PS -> FI area

OPTB Command file for WBS

OPTC Command file for network

OPTD Command file for standard network

OPTE Command file for PS info system

OPTF Command file for PS graphic

OPTG Maintain PS Info Summztn Criteria

OPTH PS info system maintenance

OPTI Maintain Progrss Analysis Overview

OPTJ Maintain PS Info Unit Conversion

OPTK Exclude Cost Elems from Avlbty Cntrl

OPTL Maintain PS Info Comparison Criteria

OPTM Fincl Budgeting Profile for Projects

OPTN Maintain priorities

OPTO Change costing variants

OPTP Sub-network parameters

OPTQ Maintain WBS scheduling parameters

OPTR Strategies for settlement rules

OPTS Maintain project version profile

OPTT Maint. acct.assgnm.types for orders

OPTU Maint. PS Info System field settings

OPTV Maint. PS Info System sort criteria

OPTW Maint.PS Info System group. criteria

OPTX Maint. PS Info System database set.

OPTY Capacity leveling - Time profile/PS

OPTZ Matchcode for standard WBS elements

OPU0 Matchcode for standard project def.

OPU3 Production order control parameters

OPU4 Maintain Capacity Planning (SOP)

OPU5 Parameter long term planning PlndOrd

OPU6 Production order control parameters

OPU7 Control parameters plant maintenance

OPU8 Overview Var.: Header Line Info Sys.

OPU9 Overview Variant: Item Line

OPUA Field selection: Network: Header

OPUB Field selection: Network: Overview

OPUC Field selection: Network: Details

OPUD Field selection:Network confirmation

OPUH Field sel: Std. project definition

OPUI Field selection: Std. WBS elements

OPUJ Field selection: Project definition

OPUK Field selection: WBS element

OPUL PS: Maintain reduction strategies

OPUM Maintain Subprojects

OPUN Capacity overviews

OPUO Project schedule overviews

OPUP Subnetwork schedule overview

OPUQ Overall network scheduling overview

OPUR Info System: Structure overview

OPUS Maintain Version Number Entry Mask

OPUT Maintain overview variants

OPUU Maintain Network Profile

OPUV Network Type Parameters

OPUW Standard Network Status

OPUX Maintain overview variants std netwk

OPUY Overview var.:Std.ntwrk scheduling

OPUZ Control parameters plant maintenance

OPVC Convert Avlability Cntrl Tol.Limits

OPVP Collective availibility checkProfile